01
Equipment design
Based on the layout and technical specifications of the customer, the design of commercial equipment is being worked out
02
Drawings of the equipment
Upon completion of the design preparation, the designer works through the drawings of commercial equipment
03
Samples
Before starting production, our company provides samples/paints for final approval
04
Production
The production of commercial equipment takes 45-55 days after the final approval of samples/drawings